Live Configurator — Feb 2026

Drag a room.
Build a building.

Spec modular units, lock delivery windows, confirm crane schedules — the same session. No RFQs. No waiting for estimators.

Module Palette — drag to grid

Studio Unit

380 sqft · 28t

2-Bed Unit

720 sqft · 42t

Utility Core

180 sqft · 18t

Stairwell

140 sqft · 14t

Lobby Module

520 sqft · 35t

Click placed module to remove

Foundation Grid — 4 × 4

0/16 slots filled
F4F3F2F1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Drag modules from the palette onto the grid to begin

Live HUD

Residential Units
0units
Total Floor Area
0sqft
Est. Delivery
Modules Placed
0/ 16
LIVE CONFIG · AUTO-PRICING
14-Month Projects → 5 Months200+ Units DeliveredCrane-Ready Specs IncludedIBC Fire Ratings CertifiedLock Pricing in 24hrs48 GCs OnboardedModular vs Stick-Built — You DecideWorkforce Housing Fast-Track14-Month Projects → 5 Months200+ Units DeliveredCrane-Ready Specs IncludedIBC Fire Ratings CertifiedLock Pricing in 24hrs48 GCs OnboardedModular vs Stick-Built — You DecideWorkforce Housing Fast-Track
Section 01 — Timeline

14 months.
Compressed to 5.

Drag the slider to compress a real 200-unit workforce housing project from stick-built to modular. Watch phases collapse in real time.

Traditional Build
9.0months
Full Modular
0w10w20w29w39w
Design & Permits
10w
Site Prep
8w
Foundation
8w
Structure
14w
MEP & Finishes
9w
Inspection & CO
5w
Total Duration9.0 months
Weeks Saved17w
Permit-to-CO33 days
Section 02 — Cost Analysis

The math
doesn't lie.

Real numbers from 48 completed projects. Per-unit modular cost vs. traditional framing on identical workforce housing programs.

Per Unit Cost

All-in delivered cost

-30%
Modular$0
Traditional$0
You save$64kper unit

Labor (Per Unit)

On-site labor only

-67%
Modular$0
Traditional$0
You save$45kper unit

Waste Factor

Material waste on site

-83%
Modular0%
Traditional0%
You save15%per unit

Financing Cost

Of total project cost

-43%
Modular0%
Traditional0%
You save6%per unit

Schedule Risk

Avg overrun probability

-82%
Modular0%
Traditional0%
You save18%per unit

Download the Full Cost Comparison

48-page analysis. 6 project typologies. Peer-reviewed by 3 independent quantity surveyors.

Section 03 — Module Library

Every module.
Every spec.

Hover each card to flip to the full spec sheet — fire ratings, crane weights, and lead times included.

Most Booked

Studio A

Residential

Floor area380 sqft
Delivery45 days
Hover for spec sheet
Spec SheetStudio A
Sqft380 sf
Height9'6"
Crane Wt.28 tons
Fire Rating1-hr UL
Lead Time45d
Base Price$148k
Includes
  • Full kitchen
  • En-suite bath
  • Pre-wired CAT6
  • HVAC rough-in
Workforce Housing

2-Bed B

Residential

Floor area720 sqft
Delivery52 days
Hover for spec sheet
Spec Sheet2-Bed B
Sqft720 sf
Height9'6"
Crane Wt.42 tons
Fire Rating2-hr UL
Lead Time52d
Base Price$218k
Includes
  • 2 bedrooms
  • Open plan living
  • Full laundry
  • Double glazed
Required

Utility Core

Infrastructure

Floor area180 sqft
Delivery30 days
Hover for spec sheet
Spec SheetUtility Core
Sqft180 sf
Height9'6"
Crane Wt.18 tons
Fire Rating2-hr UL
Lead Time30d
Base Price$62k
Includes
  • Main electrical panel
  • Plumbing risers
  • Telecom entry
  • Metering bays
Code Compliant

Stairwell X

Circulation

Floor area140 sqft
Delivery25 days
Hover for spec sheet
Spec SheetStairwell X
Sqft140 sf
Height9'6"
Crane Wt.14 tons
Fire Rating2-hr UL
Lead Time25d
Base Price$48k
Includes
  • IBC compliant
  • Egress lighting
  • Handrails pre-installed
  • ADA compatible
Premium

Lobby G

Common Area

Floor area520 sqft
Delivery60 days
Hover for spec sheet
Spec SheetLobby G
Sqft520 sf
Height11'0"
Crane Wt.35 tons
Fire Rating2-hr UL
Lead Time60d
Base Price$185k
Includes
  • Mail cluster
  • Secure entry system
  • Accessible restroom
  • Package locker bay
Hospitality

Amenity R

Common Area

Floor area640 sqft
Delivery55 days
Hover for spec sheet
Spec SheetAmenity R
Sqft640 sf
Height10'0"
Crane Wt.38 tons
Fire Rating1-hr UL
Lead Time55d
Base Price$195k
Includes
  • Fitness rough-in
  • Lounge pre-wired
  • Rooftop-ready deck
  • EV charging conduit
Section 04 — From the Field

GCs who found
the catch.
There isn't one.

4,800+
Units Delivered
48
GCs Onboarded
5.2 mo
Avg Delivery
$142M
Construction Value
Live Field Report
"We spec'd a 96-unit workforce housing stack in one afternoon. Traditional procurement would've taken three weeks of RFQ cycles just to get ballpark numbers."

Marcus Delgado

VP of Construction, Meridian Build Group

Riverside Workforce Housing

96 units · $1.8M saved

"The crane confirmation alone was worth the switch. We had certified lift specs and site logistics locked before we'd even pulled the permit."

Patricia Okonkwo · Vantage Pacific GC

144u

"Municipal procurement moves slow — or it did. We issued an RFP, got Prefab configs back from three vendors in 48 hours, and had board approval in the same week."

James Whitfield · City of Mesa Housing Authority

218u

Ready to run your first config?

Build Your First Config →

Your config is waiting.

Resume where you left off — units, slots, delivery window.