Drag a room.
Build a building.
Spec modular units, lock delivery windows, confirm crane schedules — the same session. No RFQs. No waiting for estimators.
Module Palette — drag to grid
Studio Unit
380 sqft · 28t
2-Bed Unit
720 sqft · 42t
Utility Core
180 sqft · 18t
Stairwell
140 sqft · 14t
Lobby Module
520 sqft · 35t
Click placed module to remove
Foundation Grid — 4 × 4
0/16 slots filledDrag modules from the palette onto the grid to begin
Live HUD
14 months.
Compressed to 5.
Drag the slider to compress a real 200-unit workforce housing project from stick-built to modular. Watch phases collapse in real time.
The math
doesn't lie.
Real numbers from 48 completed projects. Per-unit modular cost vs. traditional framing on identical workforce housing programs.
Per Unit Cost
All-in delivered cost
Labor (Per Unit)
On-site labor only
Waste Factor
Material waste on site
Financing Cost
Of total project cost
Schedule Risk
Avg overrun probability
Download the Full Cost Comparison
48-page analysis. 6 project typologies. Peer-reviewed by 3 independent quantity surveyors.
Every module.
Every spec.
Hover each card to flip to the full spec sheet — fire ratings, crane weights, and lead times included.
Studio A
Residential
- ◆Full kitchen
- ◆En-suite bath
- ◆Pre-wired CAT6
- ◆HVAC rough-in
2-Bed B
Residential
- ◆2 bedrooms
- ◆Open plan living
- ◆Full laundry
- ◆Double glazed
Utility Core
Infrastructure
- ◆Main electrical panel
- ◆Plumbing risers
- ◆Telecom entry
- ◆Metering bays
Stairwell X
Circulation
- ◆IBC compliant
- ◆Egress lighting
- ◆Handrails pre-installed
- ◆ADA compatible
Lobby G
Common Area
- ◆Mail cluster
- ◆Secure entry system
- ◆Accessible restroom
- ◆Package locker bay
Amenity R
Common Area
- ◆Fitness rough-in
- ◆Lounge pre-wired
- ◆Rooftop-ready deck
- ◆EV charging conduit
GCs who found
the catch.
There isn't one.
"We spec'd a 96-unit workforce housing stack in one afternoon. Traditional procurement would've taken three weeks of RFQ cycles just to get ballpark numbers."
Marcus Delgado
VP of Construction, Meridian Build Group
Riverside Workforce Housing
96 units · $1.8M saved
"The crane confirmation alone was worth the switch. We had certified lift specs and site logistics locked before we'd even pulled the permit."
Patricia Okonkwo · Vantage Pacific GC
144u"Municipal procurement moves slow — or it did. We issued an RFP, got Prefab configs back from three vendors in 48 hours, and had board approval in the same week."
James Whitfield · City of Mesa Housing Authority
218uReady to run your first config?
Build Your First Config →Your config is waiting.
Resume where you left off — units, slots, delivery window.